
Length38m
Yard time5 months
ScopePaint, rig, deck
Delivered2023
A full topside refinish with rig survey and deck hardware rebuild, completed inside a single winter window.
The owner sailed her to Palma eleven days after she left the shed.


Next
+1 (954) 555 0142
captain@meridianmarine.com

A full topside refinish with rig survey and deck hardware rebuild, completed inside a single winter window.
The owner sailed her to Palma eleven days after she left the shed.


Next